The High Construction company has built the region’s only artificial snowmaking system for the Myler ski resort. The company has carried out the construction of pressure pipelines (up to 20 km in length) with a capacity of 40-100 bar and two pumping stations with a capacity of 100 bar, which ensure automated snowmaking across the entire area. Additionally, approximately 150 snowmaking cannons have been installed.
During the construction of the artificial snowmaking system, we utilized world-leading Demaclenko artificial snowmaking systems.
Titan 4.0 snowmaking cannons have been installed, capable of producing up to 120 m³ of snow per hour. Evo 3.0 snowmaking cannons have also been installed, designed for narrow and small sections of the slopes, which can provide up to 70 m³ of snow per hour.
To ensure the necessary water supply and pressure of up to 100 bar for all these snowmaking cannons, Austrian TIROLER ROHRE ductile iron pipes have been installed.